Week 1

Introducing a new series, From the Ground Up! Each week we'll be sharing progress videos giving you an inside look at the Phoenix Builder's showcase home, so stay tuned! This week, we finished laying the foundation and are ready to start putting the frames up for walls.

Week 2

It's time for week two of From the Ground Up! Each week we'll be sharing progress videos giving you an inside look at the Phoenix Builder's showcase home, so stay tuned! This week, we witnessed a huge transformation as we went from a bare foundation to a fully framed-out house!

 

Week 3

It's time for week three of From the Ground Up! Each week we'll be sharing progress videos giving you an inside look at the Phoenix Builder's showcase home, so stay tuned! This week, we added the decking for the roof, continued framing out the interior walls, and met with Skelton's Heating & Air to discuss the heating and cooling systems!

Week 4

It's time for week four of From the Ground Up! This week, we roughed in the fireplace, installed the stairwells, and Skelton's Heating & Air installed the air ducts for the heating and cooling. Stay tuned for next week's video!

 

Week 5

It's time for week five of From the Ground Up! This week, we met with Shea Bryars Design to plan out the kitchen & bathroom cabinets and framed out the carport!

Week 6

It's time for week six of From the Ground Up! This week, we put in our windows which will help things move along and enforce the drywall. It's starting to look more and more like a home every day!

 

Week 7 - Recap

For week seven of From the Ground Up, we're recapping the past six weeks! Check out the amazing progress!

Week 8

Plumbing is well on its way! This week, Craftsman Plumbing, Inc. began the process by installing pipes and water lines. If you need a home renovation call us at (205) 966-0543.

 

Week 9

It's week nine of From the Ground Up! This week, we met with Shea Bryars for an interior design consultation and Armstrong Electrical Contractors for our electrical wiring. Craftsman Plumbing, Inc. also continued to work on running pipes for the plumbing!

Week 10

This week on From the Ground Up, we modified the roofline by creating a larger dormer. Stay tuned for more updates!